Trending: Anna University 8th Sem Results April 2014 May/June 2014 Time Table/ Internal Marks Calculate CGPA Online SSLC Results 2014 12th Result 2014

Test Footer 1

Monday, January 14, 2013

CN 9221 ADVANCED CONSTRUCTION TECHNIQUES SYLLABUS | ANNA UNIVERSITY ME CONSTRUCTION ENGINEERING AND MANAGEMENT 2nd SEMESTER SYLLABUS REGULATION 2009 2011 2012-2013

Latest: TNEA 2014 Engineering Application Status, Counselling Date, Rank List
CN 9221 ADVANCED CONSTRUCTION TECHNIQUES SYLLABUS | ANNA UNIVERSITY ME CONSTRUCTION ENGINEERING AND MANAGEMENT 2nd SEMESTER SYLLABUS REGULATION 2009 2011 2012-2013 BELOW IS THE ANNA UNIVERSITY SECOND SEMESTER M.E CONSTRUCTION ENGINEERING AND MANAGEMENT DEPARTMENT SYLLABUS, TEXTBOOKS, REFERENCE BOOKS,EXAM PORTIONS,QUESTION BANK,PREVIOUS YEAR QUESTION PAPERS,MODEL QUESTION PAPERS, CLASS NOTES, IMPORTANT 2 MARKS, 8 MARKS, 16 MARKS TOPICS. IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011 2012-2013 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI,TIRUNELVELI,COIMBATORE), 2009 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2010

CN9221 ADVANCED CONSTRUCTION TECHNIQUES L T P C
3 0 0 3
OBJECTIVE:
 To study and understand the latest construction techniques applied to engineering
Construction
UNIT I SUB STRUCTURE CONSTRUCTION 15
Box jacking - pipe jacking - Under water construction of diaphragm walls and basement -
Tunneling techniques - piling techniques - driving well and caisson - sinking cofferdam -
cable anchoring and grouting - driving diaphragm walls, sheet piles - laying operations
for built up offshore system - shoring for deep cutting - large reservoir construction - well
points - dewatering and stand by plant equipment for underground open excavation.
UNIT II SUPER STRUCTURE CONSTRUCTION FOR BUILDINGS 10
Vacuum dewatering of concrete flooring – concrete paving technology – techniques of
construction for continuous concreting operation in tall buildings of various shapes and
varying sections – launching techniques – suspended form work – erection techniques of
tall structures, large span structures – launching techniques for heavy decks – insitu
prestressing in high rise structures, aerial transporting handling erecting lightweight
components on tall structures.
UNIT III CONSTRUCTION OF SPECIAL STRUCTURES 10
Erection of lattice towers and rigging of transmission line structures – construction
sequence in cooling towers, silos, chimney, sky scrapers, bow string bridges, cable
stayed bridges – launching and pushing of box decks – Advanced construction
techniques for offshore structures – construction sequence and methods in domes and
prestress domes – support structure for heavy equipment and conveyor and machinery
in heavy industries – erection of articulated structures, braced domes and space decks.
UNIT IV REHABILITATION TECHNIQUES 6
Mud jacking grout through slab foundation - micropiling for strengthening floor and
shallow profile - pipeline laying - protecting sheet piles, screw anchors - sub grade water
proofing, underpinning, crack stabilization techniques.
UNIT V DEMOLITION 4
Advanced techniques and sequence in demolition and dismantling.
TOTAL: 45 PERIODS
REFERENCES:
1. Robertwade Brown, Practical foundation engineering hand book, McGraw Hill
Publications, 1995.
2. Patrick Powers. J., Construction Dewatering: New Methods and Applications, John
Wiley & Sons, 1992.
3. Jerry Irvine, Advanced Construction Techniques, CA Rocketr, 1984
4. Peter.H.Emmons, “Concrete repair and maintenance illustrated”, Galgotia
Publications Pvt. Ltd., 2001.
5. Sankar, S.K. and Saraswati, S., Construction Technology, Oxford University Press,
New Delhi, 2008.

No comments:

Post a Comment

Any doubt ??? Just throw it Here...