Trending: Anna University 8th Sem Results April 2014 May/June 2014 Time Table/ Internal Marks Calculate CGPA Online SSLC Results 2014 12th Result 2014

Test Footer 1

Wednesday, December 12, 2012

IM3008 MODELLING OF MANUFACTURING SYSTEMS SYLLABUS | ANNA UNIVERSITY BE INDUSTRIAL ENGINEERING AND MANAGEMENT 8TH SEMESTER SYLLABUS REGULATION 2008 2011 2012-2013

Latest: TNEA 2014 Engineering Application Status, Counselling Date, Rank List
IM3008 MODELLING OF MANUFACTURING SYSTEMS SYLLABUS | ANNA UNIVERSITY BE INDUSTRIAL ENGINEERING AND MANAGEMENT 8TH SEMESTER SYLLABUS REGULATION 2008 2011 2012-2013 BELOW IS THE ANNA UNIVERSITY 8TH SEMESTER B.E INDUSTRIAL ENGINEERING AND MANAGEMENT DEPARTMENT SYLLABUS, TEXTBOOKS, REFERENCE BOOKS,EXAM PORTIONS,QUESTION BANK,PREVIOUS YEAR QUESTION PAPERS,MODEL QUESTION PAPERS, CLASS NOTES, IMPORTANT 2 MARKS, 8 MARKS, 16 MARKS TOPICS. IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011 2012-2013 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI, TIRUNELVELI,COIMBATORE), 2008 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009

IM3008 MODELLING OF MANUFACTURING SYSTEMS L T P C
3 0 0 3
OBJECTIVE:
To cover some of the modeling paradigms applicable for discrete items
manufacturing systems and evaluation of such systems performance.
UNIT I FOCUSED FACTORIES 9
Manufacturing Systems and Models, Focused factory types, Group Technology
– assigning machines to groups, assigning parts to machines, Mathematical
program for group formation
UNIT II UNPACED PRODUCTION LINES 9
Production lines – Paced with and without buffers – computing system
effectiveness; unpaced lines – impact of random processing times and
recovery of throughput through buffers
UNIT III FMS PLANNING MODELS 9
FMS planning and Control Hierarchy – part selection and loading problems
– knapsack and loading heuristic
UNIT IV MARKOV MODELS 9
Stochastic processes in manufacturing, Markov chain models – DTMC and
CTMC, steady state analysis, Simulation models of manufacturing systems
UNIT V QUEUING AND PETRINET MODELS 9
Queuing networks in manufacturing – Jackson and Gordon Newell, product
form solution, Petrinets in manufacturing – basic concepts, stochastic petrinets,
system performance measure
TOTAL: 45 PERIODS
REFERENCES
1. Ronald G Askin, “Modeling and Analysis of Manufacturing systems”, Wiley
sons, 2003.
65
2. Viswanadham and Narahari, “Performance modeling of automated
manufacturing systems”, PHI, 2003.
3. Nicholas J M, “Competitive Manufacturing Management”, TMH, 001.
4. Buzacot and Shantikumar, “Queueing networks in Manufacturing”, Wiley Sons,
2000.
5. Reisig W, “System Design Using Petrinets”, Springer, 2000.

No comments:

Post a Comment

Any doubt ??? Just throw it Here...