Trending: Anna University 8th Sem Results April 2014 May/June 2014 Time Table/ Internal Marks Calculate CGPA Online SSLC Results 2014 12th Result 2014

Test Footer 1

Tuesday, November 20, 2012

TT2071 APPAREL PRODUCTION AND CONTROL SYLLABUS | ANNA UNIVERSITY BTECH FASHION TECHNOLOGY 6TH SEMESTER SYLLABUS REGULATION 2008 2011 2012-2013

Latest: TNEA 2014 Engineering Application Status, Counselling Date, Rank List
TT2071 APPAREL PRODUCTION AND CONTROL SYLLABUS | ANNA UNIVERSITY BTECH FASHION TECHNOLOGY 6TH SEMESTER SYLLABUS REGULATION 2008 2011 2012-2013 BELOW IS THE ANNA UNIVERSITY SIXTH SEMESTER B.TECH FASHION TECHNOLOGY DEPARTMENT SYLLABUS, TEXTBOOKS, REFERENCE BOOKS,EXAM PORTIONS,QUESTION BANK,PREVIOUS YEAR QUESTION PAPERS,MODEL QUESTION PAPERS, CLASS NOTES, IMPORTANT 2 MARKS, 8 MARKS, 16 MARKS TOPICS. IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011 2012-2013 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI, TIRUNELVELI,COIMBATORE), 2008 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009

TT2071 APPAREL PRODUCTION AND CONTROL L T P C
3 0 0 3
AIM
To impart knowledge on Apparel production systems, production process planning and
control
OBJECTIVES
 To impart knowledge on different production systems
 To impart knowledge on production scheduling, planning and process control
techniques.
UNIT I INTRODUCTION 9
Control parameters, apparel production parameters, planning & lead Time. Product
development Steps from prototype to production model, importance of pre- production
activities; Introduction to timetable concepts. Product data management understanding &
interpretation of specification sheet
UNIT II OPERATION SEQUENCE DEVELOPMENT 9
Garment breakdown with machine & attachment details, development of production gird
for garment construction, development of production flowchart.
UNIT III BUNDLE TICKETS 9
Guide lines for bundle ticket design, functions of bundle tickets, bundle ticket control.
Different manufacturing systems: Make through & Assembly line manufacturing –
advantages& Disadvantages. Lay lot planning: Numerical exercises on lay lot planning
to optimize cutting cost, bundling, ticketing & cutting room control formats.
UNIT IV PRODUCTION PLANNING AND CONTROL 9
Capacity calculation for cutting, sewing & finishing Determination of machine
requirements for new factory Line balancing: Determination & allocation of man power &
machine for balanced production in existing plant for a given target
UNIT V QUALITY IN PRODUCT DEVELOPMENT 9
Quality assurance during product development – methods to avoid problems during
pattern making, garment construction and other areas Inspection procedures Work –
study in garment industry – Methods to control time and cost
TOTAL: 45 PERIODS
TEXT BOOKS:
1. Garg R.K, & Sharma V., “Production Planning and Control Management”, Dhanpat
Rai Publishing, 1998
2. Jacob Solinger, “Apparel Production Handbook”, Reinhold Publications, 1998.
53
REFERENCES:
1. Churter, A.J., “Introduction to Clothing Production Management”, Oseney Mead,
1995.
2. Carr Harold, Latham Barbara, “The Technology of Clothing Manufacture”, Om Book
Service, 1994.
3. Bracken Bury, “Knitted Clothing Technology”, Om Books Service, 1999.
4. Gerry Cooklin, “Introduction to Clothing Manufacture”, Blackwell Science Ltd., 1995.
5. Gerry Cooklin, “Garment Technology for Fashion Designers”, Om Books service,
1997.

No comments:

Post a Comment

Any doubt ??? Just throw it Here...