PS 9213 ELECTRICAL TRANSIENTS IN POWER SYSTEMS SYLLABUS | ANNA UNIVERSITY ME POWER SYSTEMS ENGINEERING 1ST SEM SYLLABUS REGULATION 2009 2011 2012-2013 BELOW IS THE ANNA UNIVERSITY FIRST SEMESTER M.E SYSTEMS ENGINEERING DEPARTMENT SYLLABUS, TEXTBOOKS, REFERENCE BOOKS,EXAM PORTIONS,QUESTION BANK,PREVIOUS YEAR QUESTION PAPERS,MODEL QUESTION PAPERS, CLASS NOTES, IMPORTANT 2 MARKS, 8 MARKS, 16 MARKS TOPICS. IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011 2012-2013 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI,TIRUNELVELI,COIMBATORE), 2009 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009
PS 9213 ELECTRICAL TRANSIENTS IN POWER SYSTEMS L T P C
3 0 0 3 UNIT I TRAVELLING WAVES ON TRANSMISSION LINE 9
Lumped and Distributed Parameters – Wave Equation – Reflection, Refraction,
Behaviour of Travelling waves at the line terminations – Lattice Diagrams – Attenuation
and Distortion – Multi-conductor system and Velocity wave.
UNIT II COMPUTATION OF POWER SYSTEM TRANSIENTS 9
Principle of digital computation – Matrix method of solution, Modal analysis,Z transforms,
Computation using EMTP – Simulation of switches and non-linear elements.
UNIT III LIGHTNING, SWITCHING AND TEMPORARY OVERVOLTAGES 9
Lightning: Physical phenomena of lightning – Interaction between lightning and power
system – Factors contributing to line design – Switching: Short line or kilometric fault –
Energizing transients - closing and re-closing of lines - line dropping, load rejection -
Voltage induced by fault – Very Fast Transient Overvoltage (VFTO)
5
UNITIV BEHAVIOUR OF WINDING UNDER TRANSIENT CONDITION 9
Initial and Final voltage distribution - Winding oscillation - traveling wave solution -
Behaviour of the transformer core under surge condition – Rotating machine – Surge in
generator and motor
UNIT V INSULATION CO-ORDINATION 9
Principle of insulation co-ordination in Air Insulated substation (AIS) and Gas Insulated
Substation (GIS), insulation level, statistical approach, co-ordination between insulation
and protection level –overvoltage protective devices – lightning arresters, substation
earthing.
TOTAL : 45 PERIODS
REFERENCES
1. Pritindra Chowdhari, “Electromagnetic transients in Power System”, John Wiley and
Sons Inc., 1996.
2. Allan Greenwood, “Electrical Transients in Power System”, Wiley & Sons Inc. New
York, 1991.
3. Klaus Ragaller, “Surges in High Voltage Networks”, Plenum Press, New York, 1980.
4. Rakosh Das Begamudre, “Extra High Voltage AC Transmission Engineering”,
(Second edition) Newage International (P) Ltd., New Delhi, 1990.
5. Naidu M S and Kamaraju V, “High Voltage Engineering”, Tata McGraw-Hill
Publishing Company Ltd., New Delhi, 2004.
6. IEEE Guide for safety in AC substation grounding IEEE Standard 80-2000.
7. Working Group 33/13-09 (1988), ‘Very fast transient phenomena associated with Gas
Insulated System’, CIGRE, 33-13, pp. 1-2
PS 9213 ELECTRICAL TRANSIENTS IN POWER SYSTEMS L T P C
3 0 0 3 UNIT I TRAVELLING WAVES ON TRANSMISSION LINE 9
Lumped and Distributed Parameters – Wave Equation – Reflection, Refraction,
Behaviour of Travelling waves at the line terminations – Lattice Diagrams – Attenuation
and Distortion – Multi-conductor system and Velocity wave.
UNIT II COMPUTATION OF POWER SYSTEM TRANSIENTS 9
Principle of digital computation – Matrix method of solution, Modal analysis,Z transforms,
Computation using EMTP – Simulation of switches and non-linear elements.
UNIT III LIGHTNING, SWITCHING AND TEMPORARY OVERVOLTAGES 9
Lightning: Physical phenomena of lightning – Interaction between lightning and power
system – Factors contributing to line design – Switching: Short line or kilometric fault –
Energizing transients - closing and re-closing of lines - line dropping, load rejection -
Voltage induced by fault – Very Fast Transient Overvoltage (VFTO)
5
UNITIV BEHAVIOUR OF WINDING UNDER TRANSIENT CONDITION 9
Initial and Final voltage distribution - Winding oscillation - traveling wave solution -
Behaviour of the transformer core under surge condition – Rotating machine – Surge in
generator and motor
UNIT V INSULATION CO-ORDINATION 9
Principle of insulation co-ordination in Air Insulated substation (AIS) and Gas Insulated
Substation (GIS), insulation level, statistical approach, co-ordination between insulation
and protection level –overvoltage protective devices – lightning arresters, substation
earthing.
TOTAL : 45 PERIODS
REFERENCES
1. Pritindra Chowdhari, “Electromagnetic transients in Power System”, John Wiley and
Sons Inc., 1996.
2. Allan Greenwood, “Electrical Transients in Power System”, Wiley & Sons Inc. New
York, 1991.
3. Klaus Ragaller, “Surges in High Voltage Networks”, Plenum Press, New York, 1980.
4. Rakosh Das Begamudre, “Extra High Voltage AC Transmission Engineering”,
(Second edition) Newage International (P) Ltd., New Delhi, 1990.
5. Naidu M S and Kamaraju V, “High Voltage Engineering”, Tata McGraw-Hill
Publishing Company Ltd., New Delhi, 2004.
6. IEEE Guide for safety in AC substation grounding IEEE Standard 80-2000.
7. Working Group 33/13-09 (1988), ‘Very fast transient phenomena associated with Gas
Insulated System’, CIGRE, 33-13, pp. 1-2