Trending: Anna University 8th Sem Results April 2014 May/June 2014 Time Table/ Internal Marks Calculate CGPA Online SSLC Results 2014 12th Result 2014

Test Footer 1

Thursday, October 4, 2012

CN 9260 QUALITY CONTROL AND ASSURANCE IN CONSTRUCTION SYLLABUS | ANNA UNIVERSITY ME CONSTRUCTION ENGINEERING AND MANAGEMENT 1ST SEM SYLLABUS REGULATION 2009 2011 2012-2013

Latest: TNEA 2014 Engineering Application Status, Counselling Date, Rank List
CN 9260 QUALITY CONTROL AND ASSURANCE IN CONSTRUCTION SYLLABUS | ANNA UNIVERSITY ME CONSTRUCTION ENGINEERING AND MANAGEMENT 1ST SEM SYLLABUS REGULATION 2009 2011 2012-2013 BELOW IS THE ANNA UNIVERSITY FIRST SEMESTER ME CONSTRUCTION ENGINEERING AND MANAGEMENT DEPARTMENT SYLLABUS, TEXTBOOKS, REFERENCE BOOKS,EXAM PORTIONS,QUESTION BANK,PREVIOUS YEAR QUESTION PAPERS,MODEL QUESTION PAPERS, CLASS NOTES, IMPORTANT 2 MARKS, 8 MARKS, 16 MARKS TOPICS. IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011 2012-2013 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI,TIRUNELVELI,COIMBATORE), 2009 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009

CN 9260 QUALITY CONTROL AND ASSURANCE IN CONSTRUCTION L T P C
3 0 0 3
OBJECTIVE:
 To study the concepts of quality and assurance and control techniques in
construction
UNIT I QUALITY MANAGEMENT 9
Introduction – Definitions and objectives – Factor influencing construction quality -
Responsibilities and authority - Quality plan - Quality Management Guidelines – Quality
circles.
14
UNIT II QUALITY SYSTEMS 9
Introduction - Quality system standard – ISO 9000 family of standards – Requirements –
Preparing Quality System Documents – Quality related training – Implementing a Quality
system – Third party Certification.
UNIT III QUALITY PLANNING 9
Quality Policy, Objectives and methods in Construction industry - Consumers
satisfaction, Ergonomics - Time of Completion - Statistical tolerance – Taguchi’s concept
of quality – Codes and Standards – Documents – Contract and construction
programming – Inspection procedures - Processes and products – Total QA / QC
programme and cost implication.
UNIT IV QUALITY ASSURANCE AND CONTROL 9
Objectives - Regularity agent, owner, design, contract and construction oriented
objectives, methods - Techniques and needs of QA/QC - Different aspects of quality -
Appraisals, Factors influencing construction quality - Critical, major failure aspects and
failure mode analysis, -Stability methods and tools, optimum design - Reliability testing,
reliability coefficient and reliability prediction.
UNIT V QULAITY IMPROVEMENT TECHNIQUES 9
Selection of new materials - Influence of drawings, detailing, specification,
standardization - Bid preparation - Construction activity, environmental safety, social and
environmental factors - Natural causes and speed of construction - Life cycle costing -
Value engineering and value analysis.
TOTAL: 45 PERIODS
REFERENCES:
1. James, J.O’ Brian, Construction Inspection Handbook – Quality Assurance and
Quality Control, Van Nostrand, New York, 1989.
2. Kwaku, A., Tena, Jose, M. Guevara, Fundamentals of Construction Management
and Organisation, Reston Publishing Co., Inc., Virginia, 1985.
3. Juran Frank, J.M. and Gryna, F.M. Quality Planning and Analysis, Tata McGraw Hill,
1993
4. Hutchins.G, ISO 9000, Viva Books, New Delhi, 2000
5. Clarkson H. Oglesby, Productivity Improvement in Construction, McGraw-Hill, 1989.
6. John L. Ashford, The Management of Quality in Construction, E & F.N.Spon, New
York, 1989.
7. Steven McCabe, Quality Improvement Techniques in Construction, Addison Wesley
Longman Ltd, England. 1998.

No comments:

Post a Comment

Any doubt ??? Just throw it Here...