TT2306 FABRIC MANUFACTURE LAB II SYLLABUS | ANNA UNIVERSITY B.TECH TEXTILE TECHNOLOGY 5TH SEMESTER SYLLABUS REGULATION 2008 2011 2012-2013 BELOW IS THE ANNA UNIVERSITY FIFTH SEMESTER B.TECH TEXTILE TECHNOLOGY DEPARTMENT SYLLABUS, TEXTBOOKS, REFERENCE BOOKS, IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011 2012-2013 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI,TIRUNELVELI,COIMBATORE), 2008 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009
TT2306 FABRIC MANUFACTURE LAB II L T P C
0 0 3 2
AIM
To develop the skills among students in the operation and maintenance of the various
machines suitable for fabric production.
OBJECTIVES
To study the mechanism / settings in cone winding machines, pirn winding and nonauto
loom and effect of altering the various parameters.
To develop skills in the operation and maintenance of all the above machines.
To improve skills also in the operation and maintenance of the various attachments
like dobbies, jacquards, etc on non-automatic loom.
LIST OF EXPERIMENTS
(Minimum of ten experiments shall be offered)
To study the mechanism, setting & operation of the following loom motions.
Tappet Shedding
Dobby and method of pegging.
Side Weft Fork Mechanism
Loose Reed
Fast Reed
Loom Brake and Clutch Mechanism
4x1 Drop Box Mechanism
4 x 4 Drop Box Mechanism and Pick at will Motion
Positive Let off
Warp Stop Motion
Automatic Pirn Changing
Centre Weft Fork Motion
Shuttleless Loom
EQUIPMENT REQUIRED
1. Tappet shedding – positive / negative - 1 each
2. Shuttle picking mechanism – Over pick or under pick - 1each
3. Beat up mechanism - 1
4. Take up mechanism (Five wheel or Seven wheel) - 1 each
5. Negative let-off mechanism - 1
6. Positive let-off mechanism - 1
7. Warp protector mechanism – loose reed and fast reed - 1 each
8. Weft fork mechanism - 1
9. Automatic pirn changing mechanism (Desirable) - 1
10. Automatic warp stop motion (Desirable) - 1
11. Drop box loom - 1
12. Terry fabric weaving (Desirable) - 1
13. Plain, Interlock and Rib knitting machines (Desirable) - 1 each
TOTAL: 45 PERIODS
TT2306 FABRIC MANUFACTURE LAB II L T P C
0 0 3 2
AIM
To develop the skills among students in the operation and maintenance of the various
machines suitable for fabric production.
OBJECTIVES
To study the mechanism / settings in cone winding machines, pirn winding and nonauto
loom and effect of altering the various parameters.
To develop skills in the operation and maintenance of all the above machines.
To improve skills also in the operation and maintenance of the various attachments
like dobbies, jacquards, etc on non-automatic loom.
LIST OF EXPERIMENTS
(Minimum of ten experiments shall be offered)
To study the mechanism, setting & operation of the following loom motions.
Tappet Shedding
Dobby and method of pegging.
Side Weft Fork Mechanism
Loose Reed
Fast Reed
Loom Brake and Clutch Mechanism
4x1 Drop Box Mechanism
4 x 4 Drop Box Mechanism and Pick at will Motion
Positive Let off
Warp Stop Motion
Automatic Pirn Changing
Centre Weft Fork Motion
Shuttleless Loom
EQUIPMENT REQUIRED
1. Tappet shedding – positive / negative - 1 each
2. Shuttle picking mechanism – Over pick or under pick - 1each
3. Beat up mechanism - 1
4. Take up mechanism (Five wheel or Seven wheel) - 1 each
5. Negative let-off mechanism - 1
6. Positive let-off mechanism - 1
7. Warp protector mechanism – loose reed and fast reed - 1 each
8. Weft fork mechanism - 1
9. Automatic pirn changing mechanism (Desirable) - 1
10. Automatic warp stop motion (Desirable) - 1
11. Drop box loom - 1
12. Terry fabric weaving (Desirable) - 1
13. Plain, Interlock and Rib knitting machines (Desirable) - 1 each
TOTAL: 45 PERIODS
No comments:
Post a Comment
Any doubt ??? Just throw it Here...