EN3309 ENVIRONMENTAL ENGINEERING LABORATORY – III SYLLABUS | ANNA UNIVERSITY BE ENVIRONMENTAL ENGINEERING 5TH SEMESTER SYLLABUS REGULATION 2008 2011-2012 BELOW IS THE ANNA UNIVERSITY FIFTH SEMESTER BE ENVIRONMENTAL ENGINEERING DEPARTMENT SYLLABUS IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011-2012 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI,TIRUNELVELI,COIMBATORE), 2008 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009
EN3309 ENVIRONMENTAL ENGINEERING LABORATORY – III L T P C
(PLUMBING, PIPING AND HOUSE WIRING) 0 0 3 2
AIM
To provide an exposure of basic engineering practices to the student.
PLUMBING WORKS:
1. Study of pipeline joints, its location and functions: valves, taps, couplings, unions,
reducers, and elbows in household fittings.
2. Study of pipe connections requirements for pumps – Connections.
3. Preparation of plumbing line sketches for water supply and sewage works.
4. Hands- on - Exercise:. Basic pipe connections - Mixed pipe material connection -
pipe connections with different joining components.
5. Demonstration of plumbing requirements of high-rise buildings.
PIPING:
1. Practical of making plain surface with file over metal surface
2. Practice of pipe cutting and remaking
3. Practice of thread cutting of pipe, socket, nipple & Tee
4. Practice of bending G.I. pipe
5. Practice rectangular pipe services connection with different fittings in different way
and disconnect the same.
54
HOUSE WIRING:
1. Residential house wiring using switches, fuse, indicator, lamp and energy meter.
2. Fluorescent lamp wiring
3. Stair-case wiring
4. Measurement of electrical quantities - voltage, current, power & power factor in RLC
circuit.
5. Measurement of energy using single phase energy meter.
6. Measurement of resistance to earth of an electrical equipment.
TOTAL: 45 PERIODS
EN3309 ENVIRONMENTAL ENGINEERING LABORATORY – III L T P C
(PLUMBING, PIPING AND HOUSE WIRING) 0 0 3 2
AIM
To provide an exposure of basic engineering practices to the student.
PLUMBING WORKS:
1. Study of pipeline joints, its location and functions: valves, taps, couplings, unions,
reducers, and elbows in household fittings.
2. Study of pipe connections requirements for pumps – Connections.
3. Preparation of plumbing line sketches for water supply and sewage works.
4. Hands- on - Exercise:. Basic pipe connections - Mixed pipe material connection -
pipe connections with different joining components.
5. Demonstration of plumbing requirements of high-rise buildings.
PIPING:
1. Practical of making plain surface with file over metal surface
2. Practice of pipe cutting and remaking
3. Practice of thread cutting of pipe, socket, nipple & Tee
4. Practice of bending G.I. pipe
5. Practice rectangular pipe services connection with different fittings in different way
and disconnect the same.
54
HOUSE WIRING:
1. Residential house wiring using switches, fuse, indicator, lamp and energy meter.
2. Fluorescent lamp wiring
3. Stair-case wiring
4. Measurement of electrical quantities - voltage, current, power & power factor in RLC
circuit.
5. Measurement of energy using single phase energy meter.
6. Measurement of resistance to earth of an electrical equipment.
TOTAL: 45 PERIODS
No comments:
Post a Comment
Any doubt ??? Just throw it Here...