IM3201 WORK SYSTEM DESIGN SYLLABUS | ANNA UNIVERSITY BE INDUSTRIAL ENGINEERING AND MANAGEMENT 3RD SEMESTER SYLLABUS REGULATION 2008 2011-2012 BELOW IS THE ANNA UNIVERSITY THIRD SEMESTER BE INDUSTRIAL ENGINEERING AND MANAGEMENT DEPARTMENT SYLLABUS IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011-2012 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI,TIRUNELVELI,COIMBATORE), 2008 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009
IM3201 WORK SYSTEM DESIGN L T P C
3 0 0 3
OBJECTIVE
To impart knowledge in the area of Method study and Time study so that students can
implement these principles and techniques to improve productivity in manufacturing and
Service sectors.
17
UNIT I PRODUCTIVITY 9
Total time for a job or operation, total work content and ineffective time, – Production
and Productivity - Productivity and standard of living, Factors affecting Productivity,
Productivity measurement Models.
UNIT II METHODS ENGINEERING 9
Methods Engineering-Steps -Tools and techniques, Motion study.
UNIT III WORK MEASUREMENT 9
Stop watch time study, performance rating, allowances, Development of Standard data,
learning effect. Work measurement in Automated Processes. Computerised Labour
standards.
UNIT IV APPLIED WORK MEASUREMENT 9
Work sampling, Group Timing Technique (GTT), predetermined time systems, types,
Methods Time Measurement (MTM), Wage incentive plans.
UNIT V WORK DESIGN FOR OFFICE WORK 9
Organization and methods (O & M), Work measurement of office work, Work Analysis
techniques applied to support staff, Form design and control.
TOTAL: 45 PERIODS
TEXT BOOK
1. Barnes, R.M. Motion and Time Study, Design and measurement of work, John Wiley
sons(Asia), Seventh edition,2002.
REFERENCES
1. Benjamin W.Niebel, Andris Freivalds, Methods, standards & Work Design, McGraw
hill, Eleventh edition, 2002.
2. ILO, Introduction to Work Study, Oxford and IBH publishing , 2001
3. Maynard H.B, Industrial Engineering Hand book,McGraw-Hill,2001
IM3201 WORK SYSTEM DESIGN L T P C
3 0 0 3
OBJECTIVE
To impart knowledge in the area of Method study and Time study so that students can
implement these principles and techniques to improve productivity in manufacturing and
Service sectors.
17
UNIT I PRODUCTIVITY 9
Total time for a job or operation, total work content and ineffective time, – Production
and Productivity - Productivity and standard of living, Factors affecting Productivity,
Productivity measurement Models.
UNIT II METHODS ENGINEERING 9
Methods Engineering-Steps -Tools and techniques, Motion study.
UNIT III WORK MEASUREMENT 9
Stop watch time study, performance rating, allowances, Development of Standard data,
learning effect. Work measurement in Automated Processes. Computerised Labour
standards.
UNIT IV APPLIED WORK MEASUREMENT 9
Work sampling, Group Timing Technique (GTT), predetermined time systems, types,
Methods Time Measurement (MTM), Wage incentive plans.
UNIT V WORK DESIGN FOR OFFICE WORK 9
Organization and methods (O & M), Work measurement of office work, Work Analysis
techniques applied to support staff, Form design and control.
TOTAL: 45 PERIODS
TEXT BOOK
1. Barnes, R.M. Motion and Time Study, Design and measurement of work, John Wiley
sons(Asia), Seventh edition,2002.
REFERENCES
1. Benjamin W.Niebel, Andris Freivalds, Methods, standards & Work Design, McGraw
hill, Eleventh edition, 2002.
2. ILO, Introduction to Work Study, Oxford and IBH publishing , 2001
3. Maynard H.B, Industrial Engineering Hand book,McGraw-Hill,2001
No comments:
Post a Comment
Any doubt ??? Just throw it Here...