Trending: Anna University 8th Sem Results April 2014 May/June 2014 Time Table/ Internal Marks Calculate CGPA Online SSLC Results 2014 12th Result 2014

Test Footer 1

Thursday, June 28, 2012

EC2031 ELECTROMAGNETIC INTERFERENCE AND COMPATIBILITY SYLLABUS | ANNA UNIVERSITY BE ECE 7TH SEMESTER SYLLABUS REGULATION 2008 2011-2012

Latest: TNEA 2014 Engineering Application Status, Counselling Date, Rank List

EC2031 ELECTROMAGNETIC INTERFERENCE AND COMPATIBILITY SYLLABUS | ANNA UNIVERSITY BE ECE 7TH SEMESTER SYLLABUS REGULATION 2008 2011-2012 BELOW IS THE ANNA UNIVERSITY SEVENTH SEMESTER BE ELECTRONICS AND COMMUNICATION ENGINEERING DEPARTMENT SYLLABUS IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011-2012 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI,TIRUNELVELI,COIMBATORE), 2008 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009
EC2031 ELECTROMAGNETIC INTERFERENCE AND COMPATIBILITY L T P C
3 0 0 3
AIM
To understand different electromagnetic Interference problems occurring in Intersystem
and in inter system and their possible mitigation techniques in Electronic design
OBJECTIVES
 To understand EMI Sources, EMI problems and their solution methods in PCB level /
Subsystem and system level design.
 To measure the emission. immunity level from different systems to couple with the
prescribed EMC standards
UNIT I BASIC CONCEPTS 9
Definition of EMI and EMC with examples, Classification of EMI/EMC - CE, RE, CS, RS,
Units of Parameters, Sources of EMI, EMI coupling modes - CM and DM, ESD
Phenomena and effects, Transient phenomena and suppression.
UNIT II EMI MEASUREMENTS 9
Basic principles of RE, CE, RS and CS measurements, EMI measuring instruments-
Antennas, LISN, Feed through capacitor, current probe, EMC analyzer and detection
technique open area site, shielded anechoic chamber, TEM cell.
UNIT III EMC STANDARD AND REGULATIONS 8
National and Intentional standardizing organizations- FCC, CISPR, ANSI, DOD, IEC,
CENEEC, FCC CE and RE standards, CISPR, CE and RE Standards, IEC/EN, CS
standards, Frequency assignment - spectrum conversation.
89
UNIT IV EMI CONTROL METHODS AND FIXES 10
Shielding, Grounding, Bonding, Filtering, EMI gasket, Isolation transformer, opto isolator.
UNIT V EMC DESIGN AND INTERCONNECTION TECHNIQUES 9
Cable routing and connection, Component selection and mounting, PCB design- Trace
routing, Impedance control, decoupling, Zoning and grounding
TOTAL : 45 PERIODS
TEXT BOOKS
1. Prasad Kodali.V – Engineering Electromagnetic Compatibility – S.Chand&Co – New
Delhi – 2000
2. Clayton R.Paul – Introduction to Electromagnetic compatibility – John Wiley & Sons
–1992
REFERENCES
1. Keiser – Principles of Electromagnetic Compatibility – Artech House – 3rd Edition –
1994
2. Donwhite Consultant Incorporate – Handbook of EMI / EMC – Vol I – 1985

No comments:

Post a Comment

Any doubt ??? Just throw it Here...